000 04362nam a22005295i 4500
001 vtls000546448
003 RU-ToGU
005 20210922083505.0
007 cr nn 008mamaa
008 160915s2014 ne | s |||| 0|eng d
020 _a9789401780445
_9978-94-017-8044-5
024 7 _a10.1007/978-94-017-8044-5
_2doi
035 _ato000546448
040 _aSpringer
_cSpringer
_dRU-ToGU
050 4 _aTJ210.2-211.495
050 4 _aTJ163.12
072 7 _aTJFM
_2bicssc
072 7 _aTJFD
_2bicssc
072 7 _aTEC004000
_2bisacsh
072 7 _aTEC037000
_2bisacsh
082 0 4 _a629.8
_223
245 1 0 _aOptimization and Control Methods in Industrial Engineering and Construction
_helectronic resource
_cedited by Honglei Xu, Xiangyu Wang.
260 _aDordrecht :
_bSpringer Netherlands :
_bImprint: Springer,
_c2014.
300 _aX, 296 p. 63 illus., 39 illus. in color.
_bonline resource.
336 _atext
_btxt
_2rdacontent
337 _acomputer
_bc
_2rdamedia
338 _aonline resource
_bcr
_2rdacarrier
490 1 _aIntelligent Systems, Control and Automation: Science and Engineering,
_x2213-8986 ;
_v72
505 0 _aPreface -- Robustness of Convergence Proofs in Numerical Methods in Unconstrained Optimization -- Robust Optimal Control of Continuous Linear Quadratic System Subject to Disturbances -- A Linearly-Growing Conversion from the Set Splitting Problem to the Directed Hamiltonian Cycle Problem -- Optimum Confidence Interval Analysis in Two-factor Mixed Model with a Concomitant Variable for Gauge Study -- Optimization of Engineering Survey Monitoring Networks -- Distributed Fault Detection Using Consensus of Markov Chains -- Engineering Optimization Approaches of Nonferrous Metallurgical Processes -- Development of Neural Network Based Traffic Flow Predictors Using Pre-Processed Data -- Economic Scheduling of CCHP Systems Considering the Tradable Green Certificates -- Optimizations in Project Scheduling: A State-of-Art Survey -- Lean and Agile Construction Project Management: As a Way of Reducing Environmental Footprint of the Construction Industry -- Managing Construction Projects in Hong Kong: Analysis of Dynamic Implications of Industrial Improvement Strategies -- Dynamic Project Management: An Application of System Dynamics in Construction Engineering and Management. A Lean Framework for Production Control in Complex and Constrained Construction Projects (PC4P) Optimization in the Development of Target Contracts.
520 _aThis book presents recent advances in optimization and control methods with applications to industrial engineering and construction management. It consists of 15 chapters authored by recognized experts in a variety of fields including control and operation research, industrial engineering, and project management. Topics include numerical methods in unconstrained optimization, robust optimal control problems, set splitting problems, optimum confidence interval analysis, a monitoring networks optimization survey, distributed fault detection, nonferrous industrial optimization approaches, neural networks in traffic flows, economic scheduling of CCHP systems, a project scheduling optimization survey, lean and agile construction project management, practical construction projects in Hong Kong, dynamic project management, production control in PC4P, and target contracts optimization.   The book offers a valuable reference work for scientists, engineers, researchers and practitioners in industrial engineering and construction management.
650 0 _aengineering.
_9224332
650 0 _aIndustrial engineering.
_9303056
650 0 _aCivil engineering.
_9566299
650 1 4 _aEngineering.
_9224332
650 2 4 _aControl, Robotics, Mechatronics.
_9348603
650 2 4 _aCivil Engineering.
_9566300
650 2 4 _aIndustrial and Production Engineering.
_9303059
700 1 _aXu, Honglei.
_eeditor.
_9453674
700 1 _aWang, Xiangyu.
_eeditor.
_9313397
710 2 _aSpringerLink (Online service)
_9143950
773 0 _tSpringer eBooks
830 0 _aIntelligent Systems, Control and Automation: Science and Engineering,
_9311490
856 4 0 _uhttp://dx.doi.org/10.1007/978-94-017-8044-5
912 _aZDB-2-ENG
999 _c403714